Description:The administrative measures for the environmental protection acceptance of the completion of construction projects are the administrative measures promulgated and implemented by Order No. 13 of the State Environmental Protection Administration (effective on February 1, 2002).
Description:The administrative measures for the environmental protection acceptance of the completion of construction projects are the administrative measures promulgated and implemented by Order No. 13 of the State Environmental Protection Administration (effective on February 1, 2002).
Information

The administrative measures for the environmental protection acceptance of the completion of construction projects are the administrative measures promulgated and implemented by Order No. 13 of the State Environmental Protection Administration (effective on February 1, 2002). This method is to strengthen the environmental protection acceptance management of the completion of construction projects, supervise the implementation of environmental protection facilities and the main project of the construction project to be put into operation or use at the same time, and implement other supporting environmental protection measures to prevent environmental pollution and ecological damage. According to the "Construction Projects" These Measures are formulated in accordance with the Regulations on Environmental Protection Administration and other relevant laws and regulations.

Frequently Asked Questions about Environmental Protection Acceptance

Release date: 2021-12-27 15:07:33 Information source:

1. After the enterprise is put into production (operation), is it necessary to go through environmental protection acceptance procedures?
should be done. According to the "Interim Measures for Environmental Protection Acceptance upon Completion of Construction Projects", the construction unit is the main body of environmental protection acceptance upon completion of construction projects. In accordance with the procedures and standards stipulated in this law, organize the inspection and acceptance of the supporting environmental protection facilities, and prepare the acceptance report. Disclose relevant information, accept social supervision, ensure that the environmental protection facilities required by the construction project are put into production or use at the same time as the main project, and be responsible for the authenticity, accuracy and completeness of the content and conclusions, and must not falsify in the process of environmental protection acceptance.
For construction projects that mainly discharge pollutants, the acceptance monitoring report shall be prepared in accordance with the "Technical Guidelines for Environmental Protection Acceptance of Completion of Construction Projects - Pollution Impact Category"; For construction projects that have issued acceptance specifications for thermal power generation, petroleum refining, water conservancy and hydropower, nuclear and radiation, etc., an acceptance monitoring report or an environmental protection acceptance investigation report shall be prepared in accordance with the industry acceptance specifications.
If the construction unit does not have the ability to compile an acceptance monitoring (investigation) report, it can entrust a qualified technical institution to compile it. The construction unit is responsible for the conclusion of the environmental protection acceptance (investigation) report prepared by the entrusted technical institution. The rights and obligations between the construction unit and the entrusted technical institution and the responsibilities that the entrusted technical institution should undertake may be agreed in the form of a contract.
2. Can the construction unit monitor itself?
Conditions can be monitored by themselves. The acceptance monitoring shall be carried out under the condition that the main project debugging conditions are stable and the environmental protection facilities are operating normally, and the actual operation during the monitoring period shall be recorded truthfully. If there are other provisions on working conditions and production load in the relevant national and local pollutant discharge standards or industrial acceptance technical specifications, such provisions shall be followed. The construction unit can use its own personnel, sites and equipment to conduct self-monitoring according to its own conditions and capabilities; it can also entrust other capable monitoring agencies to conduct monitoring.
3. Can the unaccepted or unqualified environmental protection acceptance be put into production or use?
can not. After the acceptance monitoring (investigation) report is completed, the construction unit shall, according to the conclusions of the acceptance monitoring (investigation) report, check the unqualified environmental protection acceptance, and put forward acceptance opinions. If there is any problem, the construction unit will rectify it, and the acceptance opinion can be submitted only after the rectification is completed.
The main part of the project can be put into production or use only after the supporting environmental protection facilities of the construction project have passed the experience acceptance;

Keyword: Environmental acceptance

Contact Us

Address: No. 3 Industrial Road, Futian Industrial Park, Dingnan County, Ganzhou City, Jiangxi Province

Ganzhou Longbang Material Technology Co., Ltd

Copyright©2021 Ganzhou Longpont Material Technology Co., Ltd. All rights reserved   赣ICP备2022004279号-1   SEO